Hello,
the project scope in the course includes an example of a Tube and Clip scaffold model we'll be doing together following the scope:
The Project scope
Tube and Clip scaffolding line of bays:
- The top working platform height 4.2m
- Bay sizes are 2.4m X 1.2m
- Guardrails
- Timber decking
- Diagonal braces

Project deliverables
- 3D model - digital twin of the scaffold
Video
Timestamps
0:00 Why ScaffPlan?
0:56 Deliverables: Fully constructible 3D model
01:09 Deliverables: Gear, yard and vertical loads reports
01:24 Deliverables: 2D drawings
01:28 Deliverables: Shared 3D model with TODOs
01:40 Deliverables: 3D renders and fly-through