1.2. Project Scope and Deliverables

Written By Ilya Kornienko (Super Administrator)

Updated at August 7th, 2025

Hello, 

the project scope in the course includes a real word example of a job we'll be doing together following the scope:

The Project scope

L-shaped scaffolding perimeter with the outer corner using the  U-Layher scaffolding system

  • The top working platform height for the perimeter is 10m
  • Bay sizes are 2.57m X 1.4m with 3m standards used for verticals
  • Platforms at lifts at 10m, 8m, and 4m
  • Top ring for loading bays and the perimeter
  • 3 loading platforms at 8m lift on the outer face of the perimeter with beams.
  • An opening for access to the building
  • Access – construction and stretcher stairs
 

During this course, we'll deliver a fully constructible 3D model of a scaffold perimeter shared with a 3rd party for an overview including the following:

Project deliverables

  • Gear list
  • Yard list
  • Vertical loads engineering report
  • 2D drawings
  • Shared IFC model 
  • 3D-rendered photorealistic snapshots
  • 3D-rendered animated fly-through
 

Video

 

Timestamps

0:00 Why ScaffPlan?
0:56 Deliverables: Fully constructible 3D model
01:09 Deliverables: Gear, yard and vertical loads reports
01:24 Deliverables: 2D drawings
01:28 Deliverables: Shared 3D model with TODOs
01:40 Deliverables: 3D renders and fly-through