2.5. Setting up project information and selecting a scaffolding system
- E-Learning
-
Tips&Tricks
Quick corners by the Bay, Item and Lapping bay tools Quick and efficient step in scaffold Create F and Box ties efficiently Share a 3D model and make it available by QR codes Set and distribute tools presets Save time using model templates Reuse existing components with high speed and accuracy Quick way of adding multiple components into a bay
- Getting Started
- Working with 3D models
- Modelling
-
Scaffold Modelling tools
Scaffold Tools Overview Scaffold Item Tool Scaffold Bay tool Lapping Bay tool Buttress Bay tool Bay Connector tool Lattice Beam tool Corner Arrangements tool Wall Trace tool Bird Cage tool Circular Tank tool Stairs Temporary Roof Containment Mesh Encapsulation Wall Ties Tube Connector Tube and Clip Custom Item tool Phase Manager Utilities Help Ribbon
- Drawings
- Exporting
- Reporting & Engineering
- Release notes
Table of Contents
Learning outcomes
- Setting up project properties.
- Selecting scaffolding system to use.
- Item detail - Scaffold components level of detail.
- Defining designer, modeller, checker initials.
- Naming the project.
- Providing job number.
Video
Timestamps
0:00 Introduction
0:22 Open project properties
0:38 Select scaffolding system to use
0:45 Item detail - Scaffold components level of detail
1:06 Define scaffolder designer, modeller and checker initials
1:16 Define client details
1:25 Define name of the project
1:35 Define job number
1:45 Revisit and change project information
PREVIOUS PAGE: NEXT PAGE: