1.1. Project Scope and Deliverables

Written By Ilya Kornienko (Super Administrator)

Updated at August 7th, 2025

Hello, 

the project scope in the course includes an example of a Tube and Clip scaffold model we'll be doing together following the scope:

The Project scope

Tube and Fitting scaffolding line of bays:

  • The top working platform height 4.4m
  • The line is 5 bay by 2m x 1.2m 
  • Guardrails
  • Timber decking
  • Toeboards
  • Deadmen tubes
  • Face, side and Ledger braces
 

Project deliverables

  • 3D model of the scaffold line
 

Video

 

Timestamps

0:00 Why ScaffPlan?
0:56 Deliverables: Fully constructible 3D model
01:09 Deliverables: Gear, yard and vertical loads reports
01:24 Deliverables: 2D drawings
01:28 Deliverables: Shared 3D model with TODOs
01:40 Deliverables: 3D renders and fly-through