1.1. Project Scope and Deliverables

Written By Ilya Kornienko

Updated at September 25th, 2025

Hello, 

the project scope in the course includes an example of a model we'll be doing together following the scope:

The Project scope

Pedestrian Gantry scaffolding line of bays using Kwikstage scaffolding system:

  • The top working platform height 3m
  • Bay sizes are 2.4m X 2.4m with 3m standards used for verticals
  • Platforms at 3m lift only
  • Double standards connected by CC couplers
  • Hoarding trusses 
  • Planks on the top of deck
  • Diagonal braces
 

Project deliverables

  • 3D model - digital twin of the scaffold
  • Accurate Gear list
  • 3D-rendered photorealistic images
  • 3D-rendered animated fly-through
  • Exported IFC model shared with anyone using Trimble Connect web
  • 2D drawing with a QR code for 3D model access from any device
 

Video

 

Timestamps

0:00 Why ScaffPlan?
0:56 Deliverables: Fully constructible 3D model
01:09 Deliverables: Gear, yard and vertical loads reports
01:24 Deliverables: 2D drawings
01:28 Deliverables: Shared 3D model with TODOs
01:40 Deliverables: 3D renders and fly-through

 