1.1. Project Scope and Deliverables
- E-Learning
-
Tips&Tricks
Quick corners by the Bay, Item and Lapping bay tools Quick and efficient step in scaffold Create F and Box ties efficiently Share a 3D model and make it available by QR codes Set and distribute tools presets Save time using model templates Reuse existing components with high speed and accuracy Quick way of adding multiple components into a bay
- Getting Started
- Working with 3D models
- Modelling
-
Scaffold Modelling tools
Scaffold Tools Overview Scaffold Item Tool Scaffold Bay tool Lapping Bay tool Buttress Bay tool Bay Connector tool Lattice Beam tool Corner Arrangements tool Wall Trace tool Bird Cage tool Circular Tank tool Stairs Temporary Roof Containment Mesh Encapsulation Wall Ties Tube Connector Tube and Clip Custom Item tool Phase Manager Utilities Help Ribbon
- Drawings
- Exporting
- Reporting & Engineering
- Release notes
Table of Contents
Hello,
the project scope in the course includes an example of a Tube and Clip scaffold model we'll be doing together following the scope:
The Project scope
Tube and Clip scaffolding line of bays:
- The top working platform height 4.2m
- Bay sizes are 2.4m X 1.2m
- Guardrails
- Timber decking
- Diagonal braces
Project deliverables
- 3D model - digital twin of the scaffold
Video
Timestamps
0:00 Why ScaffPlan?
0:56 Deliverables: Fully constructible 3D model
01:09 Deliverables: Gear, yard and vertical loads reports
01:24 Deliverables: 2D drawings
01:28 Deliverables: Shared 3D model with TODOs
01:40 Deliverables: 3D renders and fly-through